AZ Licensed & Bonded $2M General Liability OSHA-10 Certified Crews COI Within 2 Hours Workers’ Comp Verified
Phoenix, AZ — Post-Construction Cleaning Specialists

Certified Clear.
Delivered on Schedule.

Phoenix’s most document-ready post-construction cleaning crew. OSHA-10 certified, same-day insured, and on-site within 48 hours — every phase, every time.

OSHA-10 Certified COI Same-Day 98.2% On-Time $2M GL Coverage Phoenix, AZ
Active Sites
7
In-progress projects
Sq. Ft. Cleared (MTD)
0
Month-to-date
On-Time Delivery
98.2%
Last 90 days
Next Availability
Live status
500K+
Sq. Ft. Completed
48hr
Mobilization Window
98.2%
On-Time Rate
$2M
GL Coverage
2hr
COI Delivery
500K+
Sq. Ft. Completed
48hr
Mobilization
98.2%
On-Time Rate
$2M
GL Coverage
2hr
Closeout Packet

Three Phases.
Zero Compromises.

Rough Phase Clean

Initial debris removal and structural prep following framing and MEP rough-in. Prepares the site for insulation and drywall installation on schedule.

Detail Phase Clean

Post-drywall and finish work cleaning. Window polish, fixture wipe-down, and surface preparation ahead of flooring and millwork installation.

Final Phase Clean

CO-ready cleaning with full white-glove pass, punch-list alignment, and photographic delivery confirmation for the GC record.

Post-Construction Reports

Digital delivery: timestamped photos, scope completion checklist, and documentation ready for your PM close-out binder.

Pressure Washing & Exterior

Exterior surface washing, concrete panel cleaning, and hardscape prep coordinated with the superintendent for inspection readiness.

OSHA & Compliance Package

Full documentation suite: $2M liability, workers comp verification, OSHA-10 certified leads, and additional insured endorsements on request.

From First Call to
Final Sign-Off.

Six steps. Every project, every time.

01

Scope Submission

Submit your square footage, phase, and target dates. We respond with a formal quote within 24 hours.

Turnaround: 24 hrs
02

Site Walkthrough

A certified project lead visits to assess access, condition, and site-specific requirements. No surprises on day one.

Complimentary
03

Documentation & COI Issuance

All insurance certificates and crew certifications submitted before any crew sets foot on-site.

Same-day COI delivery
04

Crew Mobilization

OSHA-10 certified crew leads brief the team on-site. Daily progress photos logged and available on request.

OSHA-10 leads on every job
05

Quality Inspection

Lead supervisor performs a systematic punch-list walkthrough. Any deficiencies addressed before sign-off.

100% punch-list coverage
06

Delivery & Close-Out Package

GC receives timestamped photo report and signed completion checklist within 2 hours of site clearance.

2-hr digital delivery

Six Data Points.
Bid in 24 Hours.

No lengthy intake forms. Give us these six things and we turn around a detailed, line-item bid same day.

01
Square Footage
Total buildable area. Per-floor breakdown helps but isn’t required.
02
Phase Required
Rough, Detail, Final, or all three. Partial-phase pricing available.
03
Target Date
When does the site need to be clear for inspection or handoff?
04
Site Access Status
Open access, badged entry, escort required, or after-hours only?
05
Power & Water
Confirmed available on-site? We bring our own equipment but need live utilities.
06
Ceiling Height & Finish Level
Standard (9-10ft) vs high-bay (16ft+). High-gloss or standard finish spec?
EMAIL YOUR PROJECT DETAILS → Call (602) 726-1739

Get a Range Estimate
in 30 Seconds.

Non-binding range estimate only.

Enter project details to generate an instant estimate.
✓ Estimate Generated
Estimated Project Range

Send me this estimate + book a walkthrough

Scope & Capability
at Every Scale.

Our experience spans commercial, industrial, medical, and multi-family construction.

Project Type Sector Sq. Ft. Floors Phases Completed Closeout Package On-Time
Class-A Commercial OfficeCorporate40,0006FinalPhotos + checklist ⋅ 1h 47m✓ On Time
Mixed-Use Ground-UpRetail + Office28,5004All 3 PhasesIn progressActive
Multi-Family Residential TowerResidential62,00012Detail + FinalPhotos + checklist ⋅ 2h 03m✓ On Time
Outpatient Medical FacilityHealthcare18,2002FinalScheduledUpcoming
Phase 2 Industrial WarehouseIndustrial91,0001Rough + DetailPhotos + checklist ⋅ 1h 52m✓ On Time
Mission-Critical Data CenterTechnology33,4003All 3 PhasesIn progressActive
Large-Format Adaptive ReuseMixed-Use145,0002RoughScheduledUpcoming
Tenant Improvement, Class-B OfficeCorporate TI12,8001Detail + FinalPhotos + checklist ⋅ 58m✓ On Time

Specialized protocols for institutional, healthcare, and mission-critical project awards.

Medical-Grade Sanitation Protocols

EPA-registered disinfectants and ICRA-compliant containment for healthcare final cleans.

Dust-Mitigation for Tenant Improvements

Negative air pressure, HEPA vacuuming, and staged access for occupied building TI work.

Post-Drywall Surface Preparation

Compound dust removal and substrate inspection prep ahead of paint, flooring, and millwork.

High-Gloss Floor Finishing

Multi-stage stripping, buffing, and sealing for concrete, VCT, luxury vinyl, and hardwood.

Your Documentation.
Always Ready.

Every active project gets a live dashboard — daily logs, photo sets, punch-list status, and one-click closeout packet generation. A systems vendor, not just a cleaning crew.

Class-A Commercial Office — Phoenix
40,000 sq ft · Final Phase · Target: Feb 20, 2026
Active
Mission-Critical Data Center — Scottsdale
33,400 sq ft · All 3 Phases · Target: Mar 3, 2026
Active
Mixed-Use Ground-Up — Tempe
28,500 sq ft · All 3 Phases · Target: Feb 28, 2026
Active
Class-A Commercial Office — Site Log
Feb 13, 2026 · 7:14 AM
Crew of 6 mobilized. Debris sweep floors 1–3. Power and water live.
Rough Phase
Feb 12, 2026 · 4:32 PM
Drywall dust sweep all corridors floors 4–6. Window frames pre-cleaned. 18 photos logged.
Detail Phase
Feb 11, 2026 · 6:55 AM
Pre-mobilization site walkthrough complete. COI delivered to GC at 7:03 AM.
Pre-Mob
Final Phase Punch-List — 11 of 14 Complete
All debris removed — all floors
Windows cleaned interior and exterior
All fixtures wiped and streak-free
Floors swept, mopped, buffed — floors 1–4
Millwork surfaces dusted and wiped
Restrooms sanitized, fixtures polished
HVAC diffusers and grilles wiped
Elevator cabs cleaned
Exterior entryways pressure washed
Photo documentation compiled
Supervisor QC walkthrough complete
Floors 5–6 final buffing pass
Roof deck access points cleared
GC sign-off signature obtained
Generate Closeout Packet

One click. Cover sheet, checklist, timestamped photos, and signature block — archive-ready.

Project cover sheet with meta
Phase-by-phase completion checklist
Timestamped before/after photos
Signature block + date/time stamp
GL + Workers Comp certificates
Click Generate to build packet
Project Admin

Create New Project

Quick Actions

What GCs Say
After Closeout.

"

AllClearSites had their documentation to us in under an hour and mobilized the next morning. Final clean was done two days ahead of our CO inspection. First contractor in years that made us look good to the owner.

MR

Marcus R.

Sr. Project Manager, General Contractor

"

We've used five different cleaning crews over three years. AllClearSites is the only one that shows up with documentation already in order. The photo delivery package alone saves me 3 hours at closeout.

JK

Jennifer K.

Project Executive, Commercial GC

"

Called them Friday afternoon for an emergency final clean Monday morning on a 33k sqft data center. They were there at 6am, OSHA docs in hand. Inspection passed same day. Impressed.

DT

Derek T.

Superintendent, General Contractor

Questions GCs
Ask Us Most.

For standard scheduling, we mobilize within 48-72 hours of bid acceptance. For rush and emergency projects, same-day or next-morning mobilization is available at the applicable rate.
General Liability ($2M per occurrence / $4M aggregate), Workers Compensation, and Additional Insured endorsement. Certificates issued within 2 hours. Email bids@allclearsites.site for urgent requests.
We specialize in post-construction cleaning only. Projects with lead paint, asbestos, or regulated materials require a licensed abatement contractor first. Once the site is certified clear, we handle all cleaning phases.
The estimator gives a non-binding range. Actual pricing depends on site condition, access, ceiling heights, and finishes. Site walkthroughs are complimentary and final bids delivered within 24 hours.
Yes. We handle TI projects in partially or fully occupied buildings with after-hours and weekend mobilization. Noise-restricted and dust-controlled cleaning methods are standard for TI work.
Greater Phoenix Metro Area: Scottsdale, Tempe, Mesa, Chandler, Gilbert, Peoria, Glendale, and Surprise. Statewide mobilization available for larger projects. Contact bids@allclearsites.site.

Book a Walkthrough.
Lock Your Date.

Select a date and time. Our coordinator confirms within 1 business hour.

Schedule a Walkthrough
Slots available
February 2026
Available Times -
Ready to Get Started?

Get a Formal Bid Within 24 Hours.

Send us your square footage and target phase. We'll turn around a detailed, line-item bid — no obligation, no pressure.

EMAIL A BID REQUEST → Or call (602) 726-1739
Ready to Get Started?

Formal Bid Within 24 Hours.

Send square footage and target phase. Detailed line-item bid back same day — no pressure.

EMAIL A BID REQUEST → Or call (602) 726-1739
© 2026 AllClearSites.site — Licensed, Bonded & Insured in Arizona. Serving Phoenix Metro & Maricopa County.
allclearsites.site